logo logo
  • عربي
  • About us
    • Management Message
    • Who we are
    • Vision, Mission and Values
    • Location
  • Products
    • Bag Cement
    • Bulk Cement
  • Sustainability
  • Customers & Suppliers
  • News
  • Media
  • Contact Us
    • Join us
    • Contact Info

Plant

Loading, Please Wait..
Sunset view of the plant.
Sunset view of the plant.
The CCR “Centralized control room” at Cementra plant which operates, monitors and control the various cement production cycles.
The CCR “Centralized control room” at Cementra plant which operates, monitors and control the various cement production cycles.
The Rotary Kiln: The stage where partially decarbonated materials enter the rotary kiln and decarbonation takes place followed by the formation of clinker in the burning zone reaching to 1450 ºC, the temperature that is generated by high impulsion flame
The Rotary Kiln: The stage where partially decarbonated materials enter the rotary kiln and decarbonation takes place followed by the formation of clinker in the burning zone reaching to 1450 ºC, the temperature that is generated by high impulsion flame
Preheater tower: consists of several stages arranged vertically and recovering kiln exhaust gas for pulverized material drying, controlled de-carbonation and material heating at degrees reaching up to 860 ºC.
Preheater tower: consists of several stages arranged vertically and recovering kiln exhaust gas for pulverized material drying, controlled de-carbonation and material heating at degrees reaching up to 860 ºC.
Raw Materials Conveyors at Cementra Plant.
Raw Materials Conveyors at Cementra Plant.
Raw materials Stacker: A function of the stacker and reclaimer system in which the raw materials are stored in longitudinal stockpiles, facilitating continuous retrieval of homogeneous materials that are conveyed into buffer storages and grinding process
Raw materials Stacker: A function of the stacker and reclaimer system in which the raw materials are stored in longitudinal stockpiles, facilitating continuous retrieval of homogeneous materials that are conveyed into buffer storages and grinding process
The process of raw materials preparation at Cementra’s plant relies on the heavy monster trucks by Komatsu ... A real partnership.
The process of raw materials preparation at Cementra’s plant relies on the heavy monster trucks by Komatsu ... A real partnership.

About us

  • Management Message
  • Who we are
  • Vision, Mission and Values
  • Location

Information

  • Sustainable Development
  • Bag Cement
  • Bulk Cement
  • Join us
  • Contact us

Media Center

  • Palestinian Delegation Visit to Cementra Plant
  • Reaccreditation of the ISO/IEC 17025 certificate
  • Jordan Strategy Forum Sponsorship
logo
Founding member of
Follow us

© 2018 Cementra. All rights reserved.

  • About us
    • Management Message
    • Who we are
    • Vision, Mission and Values
    • Location
  • Products
    • Bag Cement
    • Bulk Cement
  • Sustainability
  • Customers & Suppliers
  • News
  • Media
  • Contact Us
    • Join us
    • Contact Info
  • عربي

‹ › ×